The Ogden Point Breakwater is getting a new look - guard rails. When they have finished installing these I suspect they will look very nice and encourage more people to walk out on the breakwater. Click the Ogden Point Breakwater label below to see how it looked without the rails.
Custom Search
Wednesday, February 27, 2013
Subscribe to:
Post Comments (Atom)
7 comments:
There's a big difference between the before and after. It should make the people feel safer.
I followed the guardrail debate with some interest. I was always clenched whenever I saw adults with young children. The adults would be engaged in conversation and the kids would be lurching about unchecked. I was always terrified one of them would topple off the edge.
I had never been out on it but I don't like walking out on long pier type structures w/o guard rails either. I'm always afraid I'll fall in or someone will push me.
I'd feel safer with the guard rails.
I can definitely see the need for it.
When is this expected to be completed?
Hi Nadia,
It was scheduled to be completed in March so I suspect that it has been completed by now. If not it must be very close to completion.
BM
Post a Comment